Skip to content Skip to navigation

Technical Reports

Technical reports are available from a variety of series, spanning many different reporting groups and funding agencies. To date, all known reports that are present in the Archive have been scanned and appear on this site!

If you find an error on these pages, or have information regarding any of our missing reports, please send a message to the Technical Reports Archive at stat-techreports@lists.stanford.edu.

You can search using title keywords, author, and/or year of issue, or browse the reports by series.

Format: 2018
Report # (Alt Rpt #) Date Author Title Note
LIE ONR 19
Oct 1954
W.G. Ireson Some Practical Aspects of the Lot Plot Sampling Acceptance Plan
LIE ONR 18
Oct 1954
L.E. Moses Some Theoretical Aspects of the Lot Plot Sampling Inspection Plan
LIE ONR 17
Sep 1954
G.J. Lieberman
H. Solomon
Multi-Level Continuous Sampling Plans
LIE ONR 16
Jul 1954
M.A. Girshick A Sequential Inspection Plan for Quality Control
LIE ONR 15
Jul 1954
G.J. Resnikoff The Distribution of the Average-Range for Subgroups of Five not present in the Archive
LIE ONR 14
Jul 1954
A. Askin
D. Guthrie
A Biased Estimate of the Process Average
LIE ONR 13
Mar 1956
G.J. Lieberman
G.J. Resnikoff
Sampling Plans for Inspection by Variables
LIE ONR 12
Feb 1953
G.J. Lieberman A Note on Dodge's Continuous Inspection Plan
LIE ONR 11
Nov 1952
W.G. Ireson
G.J. Resnikoff
Sampling Tables for Variables Inspection Based on the Range
LIE ONR 10
Mar 1955
G. Gregory
G.J. Resnikoff
Some Notes on Mixed Variables and Attributes Sampling Plans

Pages